-
Model List:
- Waratah CF1 Boom
- Waratah CF5 Boom
- Waratah CF7 Boom
- Waratah CF7S Boom
- Waratah CF8 Boom
- 1. Table of Contents
- 2. Foreword
- 2.1. Copyright
- 2.2. Foreword
- 2.3. Declaration of Incorporation
- 2.4. Product identification
- 2.5. Base machine requirements
- 3. Safety
- 3.1. Follow Laws and Regulations
- 3.1.1. Recognize Safety Information
- 3.1.2. Understand Signal Words
- 3.1.3. Prepare for Emergencies
- 3.1.4. Wear Protective Clothing
- 3.1.5. Handle Chemical Products Safely
- 3.2. Operating
- 3.2.1. Attach Do not Operate Tag
- 3.2.2. Avoid Crush Points
- 3.2.3. Pay Attention to Bystanders
- 3.2.4. Inspect boom
- 3.2.5. Avoid Power Lines
- 3.2.6. Keep Danger Zone Clear
- 3.2.7. Operate the Boom Safely
- 3.3. Maintenance
- 3.3.1. Keep Machine in Good Condition
- 3.3.2. Use Proper Clothing
- 3.3.3. Use Proper Tools
- 3.3.4. Support Machine Properly
- 3.3.5. Avoid High Pressure Fluids
- 3.3.6. Make Welding Repairs Safely
- 3.3.7. Avoid Heating near Pressurized Fluid Lines
- 3.3.8. Dispose of Waste Properly
- 3.4. Safety Decals
- 4. Warranty
- 4.1. Standard Warranty
- 5. Specification
- 5.1. Boom
- 5.1.1. General
- 5.1.2. CF1 reach and lifting diagrams
- 5.1.3. CF5 reach and lifting diagrams
- 5.1.4. CF5XI reach and lifting diagrams
- 5.1.5. CF5XE reach and lifting diagrams
- 5.1.6. CF7 reach and lifting diagrams
- 5.1.7. CF7S reach and lifting diagrams
- 5.1.8. CF7XI and CF7SXI reach and lifting diagrams
- 5.1.9. CF7XE and CF7SXE reach and lifting diagrams
- 5.1.10. CF8 reach and lifting diagrams
- 5.2. Components
- 5.2.1. Cylinders
- 5.2.2. Pins and Bearings
- 5.2.3. Boom Pillar
- 5.2.4. Main Boom
- 5.2.5. Jib Boom
- 5.2.6. Hidden hoses boom
- 5.2.7. Double Extension Boom
- 5.2.8. Internal hosing (XI) extension boom
- 5.2.8.1. Improvements on XI extension
- 5.2.8.2. Chain mechanism and hosing
- 5.2.8.3. Internal hosing in action
- 5.2.9. External hosing (XE) extension boom
- 5.2.9.1. Improvements on XE extension
- 5.2.10. Ylink for XI and XE booms
- 5.3. Central greasing (optional equipment)
- 5.3.1. Grease dispenser
- 5.3.2. Dispenser on boom pillar
- 5.3.3. Dispenser on jib boom
- 5.4. Boom Brochure
- 6. Installation
- 6.1. General installation requirements
- 6.2. Requirements for the hydraulic installation
- 6.3. Boom Installation Instructions
- 6.4. Hydraulic schematics
- 6.5. Electric schematics
- 6.7. CF5, CF7, CF7S
- 7. Operating Instructions
- 7.1. Operating Instructions
- 8. Maintenance
- 8.1. Maintenance Introduction
- 8.2. Welding instructions
- 8.3. Fluids and lubricants
- 8.4. GUK fastening torques
- 8.5. Checking pin joints bearing tolerances
- 8.6. Boom general servicing
- 8.7. Periodical Maintenance
- 8.7.1. First Service After 250 Hours
- 8.7.2. As required
- 8.7.2.1. Adjust tension of double extension boom chains
- 8.7.2.2. Adjust the extract and retract chains of the XI extension
- 8.7.2.3. Check the internal hosing of XI extension
- 8.7.2.4. Installing Ylink hoses
- 8.7.2.5. Adjust rotator link brakes
- 8.7.3. Every 10 hours or daily
- 8.7.3.1. Check boom structures visually
- 8.7.4. Every 50 hours or weekly
- 8.7.4.1. Check boom screw joints
- 8.7.4.2. Check joint pins of the boom
- 8.7.4.3. Check the grapple and rotator
- 8.7.4.4. Grease the boom
- 8.7.4.5. Grease the boom 1/2
- 8.7.4.6. Grease the boom (single extension) 2/2
- 8.7.4.7. Grease the boom (double extension) 2/2
- 8.7.4.8. Grease the XE boom (single extension) 2/2
- 8.7.4.9. Grease the XI boom (double extension) 2/2
- 8.7.4.10. Grease the jib boom equipped with XI extension
- 8.7.4.11. Grease link and grapple
- 8.7.5. Every 250 hours
- 8.7.5.1. Check the internal hosing of XI extension
- 8.7.5.2. Tighten two rotator clamping screws (Indexator)
- 8.7.6. Every 500 hours
- 8.7.6.1. Check sideways clearance of the extension booms
- 8.7.6.2. Check vertical clearance of the extension booms
- 8.7.6.3. Check clearances of XI/XE extension
- 8.7.7. Every 1000 hours
- 8.7.7.1. Check chain guide of double extension boom
- 8.7.7.2. Clean rotator magnetic plug
- 8.7.7.3. Tighten rotator screws
- 9. Schematics
- 9.1. Hydraulic schematics
- 9.2. Electric schematics
- 10. Transporting, towing and storing
- 10.1. Transporting the Boom
- 10.2. Preparing the boom for storage
- 11. Feedback
- 12. Attachments
- 12.1. Declaration of Incorporation template_boom_en
- 12.2. Crane_Brochure_EN_20210414_forw
- 12.3. Boom_installation_report
- 12.4. CF1_HS_en
- 12.5. CF5CF7_HS_en
- 12.6. CF8_HS_en
- 12.7. Forw_boom_ES_en





