-
Model List:
- CX250C Tier 4 Crawler Excavator
- CX250C LR Tier 4 Crawler Excavator
- 1. UPPERSTRUCTURE
- 1.1. Section 9002 Removal and Installation of Counterweight
- 1.2. Section 9003A Removal and Installation of Bucket
- 1.3. Section 9003B Removal and Installation of Bucket Link
- 1.4. Section 9003C Removal and Installation of Arm
- 1.5. Section 9003D Removal and Installation of Boom
- 1.6. Section 9004 Removal and Installation of Operators Seat
- 1.7. Section 9005A Removal and Installation of Cab Assembly
- 1.8. Section 9005B Removal and Installation of Wiper
- 1.9. Section 9005C Removal and Installation of Wiper Controller
- 1.10. Section 9005D Removal and Installation of Wiper Motor
- 1.11. Section 9005E Removal and Installation of Monitor
- 1.12. Section 9005F Removal and Installation of Cab Front Glass
- 1.13. Section 9005G Window Lock Adjustment Procedures
- 1.14. Section 9005H Tightening torque
- 1.15. Section 9006 Air Conditioner Overall Diagram
- 1.16. Section 9007 Assembly and Disassembly of Air Conditioner Units
- 1.17. Section 9009 Removal and Installation of Compressor
- 1.18. Section 9010 Removal and Installation of Condenser
- 1.19. Section 9011 Removal and Installation of Receiver Dryer
- 1.20. Section 9015 Work Precautions








