-
Model List:
- D 80 E
- D 80 ER
- D 80 ERS
- D 80 EP
- 1. TABLE OF CONTENTS
- 1.1. General points
- 1.1.1. Technical characteristics
- 1.2. Steering axle
- 1.2.1. Adjustement of wheel alignment
- 1.3. Arm Platform
- 1.3.1. Removing the hydraulic hoses mounted on the arms
- 1.3.2. Adjusting the platform overload springs
- 1.4. Hydraulics
- 1.4.1. Removing the platform rotation engine
- 1.4.2. Removing the electric pump
- 1.4.3. Removing wheel engine / brake
- 1.4.4. Removing the distributor elements
- 1.4.5. Removing the lifting cylinders
- 1.4.6. Removing the steering cylinder
- 1.4.7. Hydraulic Pressure
- 1.4.8. Hydraulic diagram
- 1.5. Electricity
- 1.5.1. Replacing the electronic baseboard and microprocessor
- 1.5.2. Removing the variator
- 1.5.3. Removing the traction battery
- 1.5.4. Replacing the electric cable bundle (platform control box main box link)
- 1.5.5. Electrical diagrams
- 1.5.6. Contrôle fonctionnement variateur SEVCON
- 2. TABLE OF CONTENTS 2
- 2.1. Electricity 2
- 2.1.1. Adjusting the switches
- 2.1.2. Manipulator assembly procedure
- 2.1.3. Position of censors
- 2.2. Troubleshooting
- 2.2.1. Tracing electrical failures








