-
Model List:
- TS3001 Subsoiler
- TS3002 Subsoiler
- TS3003 Subsoiler
- 1. Contents
- 1.0.1. Recognize Safety Information
- 1.0.2. Understand Signal Words
- 1.0.3. Follow Safety Instructions
- 1.0.4. Keep Riders Off Machine
- 1.0.5. Avoid Rollover Accidents
- 1.0.6. Prepare for Emergencies
- 1.0.7. Wear Protective Clothing
- 1.0.8. Use Safety Lights and Devices
- 1.0.9. Service Machine Safely
- 1.0.10. Practice Safe Maintenance
- 1.0.11. Remove Paint Before Welding or Heating
- 1.0.12. Store Attachments Safely
- 1.0.13. Decommissioning Proper Recycling and Disposal of Fluids and Components
- 1.1. Safety Signs
- 1.1.1. Safety Sign Locations of One Tine Subsoiler
- 1.1.2. Safety Sign Locations of Two Tine Subsoiler
- 1.1.3. Safety Sign Locations of Three Tine Subsoiler without Roller
- 1.1.4. Safety Sign Locations of Three Tine Subsoiler with Roller
- 1.1.5. Decal ARead Operators Manual
- 1.1.6. Decal BShut Off Engine, Remove Keys
- 1.1.7. Decal CHand Pinching Hazard
- 1.1.8. Decal DStay away from Raised Implement (Feet/Toe Crush or Smash)
- 1.1.9. Decal EEngage Parking Stand
- 1.2. Preparing the Tractor
- 1.2.1. Use Tractor Operators Manual
- 1.2.2. Front Counterweight
- 1.2.3. Rear Wheel Counterweight
- 1.2.4. Determine FrontEnd Ballast Without Implement Codes
- 1.2.5. Check Tire Inflation Pressure
- 1.2.6. Adjust Top Link
- 1.2.7. Sway Chains
- 1.2.8. Preparing the Hitch
- 1.2.9. Tightening Hardware
- 1.2.10. Adjust Lift Links
- 1.2.11. Float Adjustment
- 1.2.12. Use Position Control
- 1.2.13. Position Center Link
- 1.3. Preparing the Subsoiler
- 1.3.1. Tighten Hardware
- 1.4. Attaching and Detaching the Subsoiler
- 1.4.1. Attach Subsoiler to Tractor
- 1.4.2. Detaching Subsoiler from Tractor
- 1.5. Adjustments
- 1.5.1. Depth Adjustment
- 1.5.2. Parking Stand Adjustment
- 1.5.3. Tine Height Adjustment for Two and Three Tine Subsoiler
- 1.5.4. Roller Height Adjustment
- 1.6. Operating the Subsoiler
- 1.6.1. Operating the Subsoiler
- 1.6.2. Before Parking
- 1.6.3. Park Subsoiler
- 1.6.4. Keep Machines Secure
- 1.7. Transporting
- 1.7.1. Transport Safely
- 1.7.2. Transporting
- 1.8. Lubrication and Maintenance
- 1.8.1. Practice Safe Maintenance
- 1.8.2. Lubricate and Maintain the Machine Safely
- 1.8.3. Lubrication of the Subsoiler
- 1.8.4. Maintenance Schedule of Subsoiler
- 1.8.5. Lubrication and MaintenanceDaily or Every 8 hours
- 1.8.6. Lubrication and MaintenanceWeekly or Every 50 hours Work
- 1.8.7. Shear Bolt Replacement
- 1.8.8. Shovel Replacement
- 1.8.9. Shoe Replacement
- 1.9. Storage
- 1.9.1. End of Season Storage
- 1.9.2. Start of Season Preparation
- 1.9.3. Scrapping
- 1.10. Troubleshooting
- 1.10.1. Subsoiler Troubleshooting
- 1.11. Specifications
- 1.11.1. One Tine Subsoiler Specifications
- 1.11.2. Two Tine Subsoiler Specifications
- 1.11.3. Three Tine Subsoiler Specifications
- 1.11.4. Serial Number of One and Two Tine Subsoiler
- 1.11.5. Serial Number of Three Tine with and without Roller Subsoiler
- 1.11.6. Metric Bolt and Screw Torque Values
- 1.11.7. Unified Inch Bolt and Screw Torque Values
- 1.11.8. Keep Machines Secure
- 1.12. Inspection Checklists
- 1.12.1. PreDelivery Inspection
- 1.12.2. Owners Record
- 1.12.3. Delivery Inspection
- 1.12.4. AfterSales Inspection
- 1.12.5. Inspection Before Each Day of Operation
- 1.12.6. Inspection Before Each Season
- 1.13. Limited Warranty Statement
- 1.13.1. General provision
- 1.13.2. Authorised Dealers
- 1.13.3. Preconditions to Avail Warranty and Documentation Requirement
- 1.13.4. User Responsibility
- 1.13.5. Warranty Term and Equipment Covered Under This Warranty
- 1.13.6. Warranty shall not cover the following
- 1.13.7. JDIPLs liability under this Warranty
- 1.13.8. No implied Warranty, representation or condition
- 1.13.9. Dealer Warranty
- 1.13.10. Contact Information
- 1.13.11. Jurisdiction
- 1.13.12. CUSTOMER COPY
- 1.13.13. DEALER COPY
- 1.14. Implement Identification and Installation Certificate
- 1.14.1. INSTALLATION CERTIFICATE
- 1.14.2. CUSTOMER COPY
- 1.14.3. INSTALLATION CERTIFICATE
- 1.14.4. DEALER COPY
- 2. Page Number
- 2.1. Section 05
- 2.2. Section 10
- 2.3. Section 15
- 2.4. Section 20
- 2.5. Section 25
- 2.6. Section 30
- 2.7. Section 35
- 2.8. Section 40
- 2.9. Section 45
- 2.10. Section 47
- 2.11. Section 50
- 2.12. Section 55
- 2.13. Section 60
- 2.14. Section 65
- 2.15. Section 70






