John Deere GreenStar Rate Controller Dry Operator Manual OMPFP23415

$30

  • Type Of Manual: Operator Manual
  • Manual ID: OMPFP23415
  • Format: PDF
  • Size: 6.6MB
  • Number of Pages: 84

Description

  • Model List:

    • GreenStar Rate Controller Dry
  • 1. Introduction
  • 1.1. Foreword
  • 1.2. John Deere Technical Information Bookstore
  • 1.3. Recognize Safety Information
  • 1.4. Understand Signal Words
  • 1.5. Follow Safety Instructions
  • 1.6. Practice Safe Maintenance
  • 1.7. Use Steps and Handholds Correctly
  • 1.8. Handle Electronic Components and Brackets Safely
  • 1.9. Use Electronic Display Properly
  • 1.10. Operate Guidance Systems Safely
  • 1.11. Use Seat Belt Properly
  • 1.12. Wear Protective Clothing
  • 1.13. Operate Safely
  • 1.14. Read and Understand MSDS
  • 1.15. Handle Agricultural Chemicals Safely
  • 1.16. Decommissioning Proper Recycling and Disposal of Fluids and Components
  • 2. Safety Signs
  • 2.1. Unexpected Conveyor Speed Detected
  • 2.2. Unexpected Meter Speed Detected
  • 2.3. Unexpected Spinner Speed Detected
  • 2.4. Diagnostic Tests or Calibration Procedures
  • 3. Regulatory and Compliance Information
  • 3.1. Identify Date Code
  • 3.2. Customs UnionEAC (English and Russian)
  • 3.3. EU Declaration of Conformity
  • 3.4. ThailandDeclaration of Conformity
  • 3.5. UK Declaration of Conformity
  • 4. System Overview
  • 4.1. Theory of Operation
  • 4.2. GreenStar Rate Controller Requirements
  • 5. Component Overview
  • 5.1. StarFire Receiver
  • 5.2. Display
  • 5.3. Switch Box
  • 5.4. Foot Switch
  • 6. Spreader Overview
  • 6.1. Theory of Operation
  • 6.2. Spreader Run Page
  • 6.3. Component Overview and Compatibility
  • 7. Configuring Spreader
  • 7.1. Configure GreenStar Rate Controller Dry
  • 7.2. Access GreenStar Dry Rate Controller
  • 7.3. Implement Setup
  • 7.4. System Setup
  • 7.5. Alarm Setup
  • 7.6. Rate Smoothing Setup
  • 8. Configuring Spreader Products
  • 8.1. Product Setup
  • 8.2. Product Bin Setup
  • 8.3. Bin Chaining
  • 8.4. Review Product Summary
  • 9. Calibrating Spreader
  • 9.1. Calibrate CFR Catch Test
  • 9.2. Calibrate PWM Limits
  • 10. Operating Spreader
  • 10.1. GreenStar Rate Controller DrySpreader
  • 10.2. Verify UserDefined Values
  • 10.3. Bin Level Indicator and Filling
  • 10.4. Rate Control
  • 10.5. Bin Charging
  • 10.6. Bin Chaining
  • 10.7. Activate and Deactivate System
  • 11. Viewing Spreader Reports and Totals
  • 11.1. Reports and Totals
  • 12. Spreader Diagnostics
  • 12.1. Spreader Diagnostics
  • 12.2. Hardware/Software Readings
  • 12.3. Switchbox Readings
  • 12.4. Delivery System Readings
  • 12.5. System Voltages Readings
  • 12.6. Working Parameters Readings
  • 12.7. Switches/Status Readings
  • 12.8. Flow Control Test
  • 12.9. Spreader Check Test
  • 12.10. Bin Cleanout
  • 12.11. Control Valve Test
  • 13. Air Cart Overview
  • 13.1. Theory of Operation
  • 13.2. Air Cart Run Page
  • 13.3. Component Overview and Compatibility
  • 14. Configuring Air Cart
  • 14.1. Configure Air Cart
  • 14.2. Access GreenStar Dry Rate Controller
  • 14.3. Implement Setup
  • 14.4. System Setup
  • 14.5. Alarm Setup
  • 14.6. Rate Smoothing Setup
  • 15. Configuring Air Cart Products
  • 15.1. Product Setup
  • 15.2. Product Tank Setup
  • 15.3. Review Product Summary
  • 16. Calibrating Air Cart
  • 16.1. Calibrate CFR Catch Test
  • 16.2. Calibrate PWM Limits
  • 16.3. Calibrate Pressure Sensor
  • 16.3.1. Calibrate VoltageBased Pressure Sensor
  • 16.3.2. Calibrate OperationBased Pressure Sensor
  • 16.4. Calibrate Height Sensor
  • 17. Operating Air Cart
  • 17.1. GreenStar Rate Controller DryAir Cart
  • 17.2. Verify UserDefined Values
  • 17.3. Tank Level Indicator and Filling
  • 17.4. Rate Control
  • 17.5. Tank Charging
  • 17.6. Activate and Deactivate System
  • 18. Viewing Air Cart Reports and Totals
  • 18.1. Reports and Totals
  • 19. Air Cart Diagnostics
  • 19.1. Air Cart Diagnostics
  • 19.2. Hardware/Software Readings
  • 19.3. Switchbox Readings
  • 19.4. Delivery System Readings
  • 19.5. System Voltages Readings
  • 19.6. Working Parameters Readings
  • 19.7. Switches/Status Readings
  • 19.8. Sensors/Status Readings
  • 19.8.1. Height Indication
  • 19.8.2. Pressure Sensor
  • 19.9. Flow Control Test
  • 19.10. Air Cart Check Test
  • 19.11. Tank Cleanout
  • 19.12. Control Valve Test
  • 19.13. Clutch Test
  • 20. System Speed Signal
  • 20.1. System Speed Signal
  • 21. Troubleshooting
  • 21.1. Rate Controller Dry Troubleshooting
  • 21.2. Rate Controller Dry Troubleshooting
  • 21.3. Rate Controller Dry Trouble Codes
  • 21.4. GreenStar Rate Controller Switch Box Trouble Codes
  • 21.5. Control Valve Calibration Number Tuning
  • 21.6. Rename Implement
  • 21.7. Remove Implement
  • 21.8. Observable Symptoms
  • 22. Specifications
  • 22.1. Pin Connectors
  • 22.2. Connector Information for Adapter Harness
  • 22.3. Recommended Wire Sizes
  • 22.4. Driver Outputs Table
  • 23. Maintenance
  • 23.1. Preseason Checklist
  • 23.2. Daily Checklist
  • 23.3. Postseason Checklist
  • 24. John Deere Service Literature Available
  • 24.1. Technical Information
  • 25. John Deere Service Keeps You on The Job
  • 25.1. John Deere Is At Your Service
5/5 - (102 votes)
How it works?
  1. Choose a repair manual Pick manuals
  2. Confirm secure payment Confirm payment
  3. Receive the manual download link Access link sent