John Deere Waratah CF1, CF5, CF7, CF7S, CF8 Boom Operator Instruction F724870WA

$30

  • Type Of Manual: Operator Instruction
  • Manual ID: F724870WA
  • Format: PDF
  • Size: 16.2MB
  • Number of Pages: 112

Description

  • Model List:

    • Waratah CF1 Boom
    • Waratah CF5 Boom
    • Waratah CF7 Boom
    • Waratah CF7S Boom
    • Waratah CF8 Boom
  • 1. Table of Contents
  • 2. Foreword
  • 2.1. Copyright
  • 2.2. Foreword
  • 2.3. Declaration of Incorporation
  • 2.4. Product identification
  • 2.5. Base machine requirements
  • 3. Safety
  • 3.1. Follow Laws and Regulations
  • 3.1.1. Recognize Safety Information
  • 3.1.2. Understand Signal Words
  • 3.1.3. Prepare for Emergencies
  • 3.1.4. Wear Protective Clothing
  • 3.1.5. Handle Chemical Products Safely
  • 3.2. Operating
  • 3.2.1. Attach Do not Operate Tag
  • 3.2.2. Avoid Crush Points
  • 3.2.3. Pay Attention to Bystanders
  • 3.2.4. Inspect boom
  • 3.2.5. Avoid Power Lines
  • 3.2.6. Keep Danger Zone Clear
  • 3.2.7. Operate the Boom Safely
  • 3.3. Maintenance
  • 3.3.1. Keep Machine in Good Condition
  • 3.3.2. Use Proper Clothing
  • 3.3.3. Use Proper Tools
  • 3.3.4. Support Machine Properly
  • 3.3.5. Avoid High Pressure Fluids
  • 3.3.6. Make Welding Repairs Safely
  • 3.3.7. Avoid Heating near Pressurized Fluid Lines
  • 3.3.8. Dispose of Waste Properly
  • 3.4. Safety Decals
  • 4. Warranty
  • 4.1. Standard Warranty
  • 5. Specification
  • 5.1. Boom
  • 5.1.1. General
  • 5.1.2. CF1 reach and lifting diagrams
  • 5.1.3. CF5 reach and lifting diagrams
  • 5.1.4. CF5XI reach and lifting diagrams
  • 5.1.5. CF5XE reach and lifting diagrams
  • 5.1.6. CF7 reach and lifting diagrams
  • 5.1.7. CF7S reach and lifting diagrams
  • 5.1.8. CF7XI and CF7SXI reach and lifting diagrams
  • 5.1.9. CF7XE and CF7SXE reach and lifting diagrams
  • 5.1.10. CF8 reach and lifting diagrams
  • 5.2. Components
  • 5.2.1. Cylinders
  • 5.2.2. Pins and Bearings
  • 5.2.3. Boom Pillar
  • 5.2.4. Main Boom
  • 5.2.5. Jib Boom
  • 5.2.6. Hidden hoses boom
  • 5.2.7. Double Extension Boom
  • 5.2.8. Internal hosing (XI) extension boom
  • 5.2.8.1. Improvements on XI extension
  • 5.2.8.2. Chain mechanism and hosing
  • 5.2.8.3. Internal hosing in action
  • 5.2.9. External hosing (XE) extension boom
  • 5.2.9.1. Improvements on XE extension
  • 5.2.10. Ylink for XI and XE booms
  • 5.3. Central greasing (optional equipment)
  • 5.3.1. Grease dispenser
  • 5.3.2. Dispenser on boom pillar
  • 5.3.3. Dispenser on jib boom
  • 5.4. Boom Brochure
  • 6. Installation
  • 6.1. General installation requirements
  • 6.2. Requirements for the hydraulic installation
  • 6.3. Boom Installation Instructions
  • 6.4. Hydraulic schematics
  • 6.5. Electric schematics
  • 6.7. CF5, CF7, CF7S
  • 7. Operating Instructions
  • 7.1. Operating Instructions
  • 8. Maintenance
  • 8.1. Maintenance Introduction
  • 8.2. Welding instructions
  • 8.3. Fluids and lubricants
  • 8.4. GUK fastening torques
  • 8.5. Checking pin joints bearing tolerances
  • 8.6. Boom general servicing
  • 8.7. Periodical Maintenance
  • 8.7.1. First Service After 250 Hours
  • 8.7.2. As required
  • 8.7.2.1. Adjust tension of double extension boom chains
  • 8.7.2.2. Adjust the extract and retract chains of the XI extension
  • 8.7.2.3. Check the internal hosing of XI extension
  • 8.7.2.4. Installing Ylink hoses
  • 8.7.2.5. Adjust rotator link brakes
  • 8.7.3. Every 10 hours or daily
  • 8.7.3.1. Check boom structures visually
  • 8.7.4. Every 50 hours or weekly
  • 8.7.4.1. Check boom screw joints
  • 8.7.4.2. Check joint pins of the boom
  • 8.7.4.3. Check the grapple and rotator
  • 8.7.4.4. Grease the boom
  • 8.7.4.5. Grease the boom 1/2
  • 8.7.4.6. Grease the boom (single extension) 2/2
  • 8.7.4.7. Grease the boom (double extension) 2/2
  • 8.7.4.8. Grease the XE boom (single extension) 2/2
  • 8.7.4.9. Grease the XI boom (double extension) 2/2
  • 8.7.4.10. Grease the jib boom equipped with XI extension
  • 8.7.4.11. Grease link and grapple
  • 8.7.5. Every 250 hours
  • 8.7.5.1. Check the internal hosing of XI extension
  • 8.7.5.2. Tighten two rotator clamping screws (Indexator)
  • 8.7.6. Every 500 hours
  • 8.7.6.1. Check sideways clearance of the extension booms
  • 8.7.6.2. Check vertical clearance of the extension booms
  • 8.7.6.3. Check clearances of XI/XE extension
  • 8.7.7. Every 1000 hours
  • 8.7.7.1. Check chain guide of double extension boom
  • 8.7.7.2. Clean rotator magnetic plug
  • 8.7.7.3. Tighten rotator screws
  • 9. Schematics
  • 9.1. Hydraulic schematics
  • 9.2. Electric schematics
  • 10. Transporting, towing and storing
  • 10.1. Transporting the Boom
  • 10.2. Preparing the boom for storage
  • 11. Feedback
  • 12. Attachments
  • 12.1. Declaration of Incorporation template_boom_en
  • 12.2. Crane_Brochure_EN_20210414_forw
  • 12.3. Boom_installation_report
  • 12.4. CF1_HS_en
  • 12.5. CF5CF7_HS_en
  • 12.6. CF8_HS_en
  • 12.7. Forw_boom_ES_en
Rate this product
How it works?
  1. Choose a repair manual Pick manuals
  2. Confirm secure payment Confirm payment
  3. Receive the manual download link Access link sent