-
Model List:
- Rubber Track System
- 1. Contents
- 1.0.1. Recognize Safety Information
- 1.0.2. Understand Signal Words
- 1.0.3. Follow Safety Instructions
- 1.0.4. Spanish Safety Signs and Operators Manual
- 1.0.5. Replace Safety Signs
- 1.0.6. Safe Track Operating Practices
- 1.0.7. Driving the Machine
- 1.0.8. Keep Riders and Children Off Machine
- 1.0.9. Ballasting for Safe Ground Contact
- 1.0.10. Parking and Leaving the Machine
- 1.0.11. Work In Ventilated Area
- 1.0.12. Use Seat Belts
- 1.0.13. Transport Combine With Header Safely
- 1.0.14. Practice Safe Maintenance
- 1.0.15. Avoid Contact With Moving Parts
- 1.0.16. Avoid HighPressure Fluids
- 1.0.17. Service Accumulator Systems Safely
- 1.0.18. Decommissioning Proper Recycling and Disposal of Fluids and Components
- 1.0.19. Support Machine Properly
- 1.0.20. Use Proper Lifting Equipment
- 1.1. Installation Instructions
- 1.1.1. Introduction
- 1.1.2. Parts List
- 1.1.3. Average Installation Time
- 1.1.4. Remove Front Wheels (If Installed)
- 1.1.5. Remove Drive Shafts
- 1.1.6. Remove Final Drives
- 1.1.7. Install Axle Extensions
- 1.1.8. Install Truss Rod
- 1.1.9. Install Oscillation Stop Plates and Final Drives
- 1.1.10. Install Adapter Plate
- 1.1.11. Determine Track Module Assemblies
- 1.1.12. Install Track Modules
- 1.1.13. Install Cab Ladder Plates (If Required)
- 1.1.14. Change CAB Control Unit Address 130 (GreenStar 3 CommandCenter Display)
- 1.1.15. Change CAB Control Unit Address 130 (Generation 4 CommandCenter Display)
- 1.1.16. Track BreakIn Procedure
- 1.2. Operating Track Combine
- 1.2.1. Track Components
- 1.2.2. Track Features and Benefits
- 1.2.3. Operate Track Machines
- 1.2.4. Track Tensioning System
- 1.3. Ground Drive and Rear Axle
- 1.3.1. Ballast Requirements (Track Configuration) (S670 and S770)
- 1.3.2. Ballast Requirements (Track Configuration) (S680, S690, S780, and S790)
- 1.3.3. Track Module Tow Hook Locations
- 1.3.4. Towing Machine (ProDrive Transmission Machines)
- 1.4. Fire Prevention
- 1.4.1. Recommended Fire Preventions
- 1.4.2. Cleaning Tracks
- 1.5. Machine Cleanout
- 1.5.1. Track Cleanout Areas
- 1.6. Lubrication and Maintenance
- 1.6.1. Service Interval Chart
- 1.6.2. Belt Care and Conditioning BreakIn
- 1.6.3. Every 400 Hours
- 1.6.4. Every 5000 Hours
- 1.7. Specifications
- 1.7.1. Specifications
- 1.7.2. Track Module Dimensions
- 1.7.3. Combine Dimensions
- 1.7.4. Dimension Reference Points
- 1.7.5. Unified Inch Bolt and Screw Torque Values
- 1.7.6. Metric Bolt and Screw Torque Values
- 1.8. Machine Identification Numbers
- 1.8.1. Identification Numbers
- 1.8.2. Identification Plates
- 1.8.3. Identification Plate Location
- 1.9. John Deere Service Literature Available
- 1.9.1. Technical Information
- 1.10. John Deere Service Keeps You On The Job
- 1.10.1. John Deere Is At Your Service
- 2. Page Number
- 2.1. Section 05
- 2.2. Section 10
- 2.3. Section 15
- 2.4. Section 20
- 2.5. Section 25
- 2.6. Section 30
- 2.7. Section 35
- 2.8. Section 40
- 2.9. Section 45






