-
Model List:
- 1490D Slash Bundler
- 1. Contents
- 1.1. Introduction
- 1.2. WarrantyscWarrantyec
- 1.3. Safety Safety Features
- 1.4. Safety General Precautions
- 1.5. Safety Operating Precautions
- 1.6. Safety Maintenance Precautions
- 1.7. Operators Station
- 1.8. Operating the machine, Operation
- 1.9. Lifting and Lowering the Cab
- 1.10. Starting and Turning Off the Engine
- 1.11. Driving the Machine
- 1.12. Towing the Machine
- 1.13. Transportation of the Machine
- 1.14. Fluids and Lubricants
- 1.15. Maintenance General
- 1.16. Maintenance Intervals and Service Parts
- 1.17. Maintenance Every 10 hours or Daily
- 1.18. Maintenance Every 50 hours or Weekly
- 1.19. Maintenance Every 250 hours
- 1.20. Maintenance Every 500 hours
- 1.21. Maintenance Every 1000 hours
- 1.22. Maintenance Every 2000 hours
- 1.23. Maintenance Every 6 months
- 1.24. Maintenance Every 12 months
- 1.25. Maintenance As required
- 1.26. Hydraulic System Hydraulic Oil Change
- 1.27. Hydraulic System Bleeding
- 1.28. Hydrostatic System Drive Pump adjusting
- 1.29. Hydrostatic System Drive Motor adjusting
- 1.30. Work Hydraulic System Check and Adjust
- 1.31. Brake System Check and Adjust
- 1.32. Electrical System
- 1.33. Transmission
- 1.34. Boom CF5
- 1.35. Bundler Unit Components
- 1.36. Bundler Unit Using
- 1.37. Bundler Unit Maintenance
- 1.38. Bundler Unit Troubleshooting
- 1.39. Equipment, Air Conditioner
- 1.40. Equipment, Engine Preheater
- 1.41. Equipment, Fire Extinguisher System
- 1.42. Equipment, Decking Blade
- 1.43. Hydraulic Diagrams
- 1.44. Electric Diagrams
- 1.45. Specifications
- 2. Page Numbers
- 2.1. Section 11
- 2.2. Section 21
- 2.3. Section 31
- 2.4. Section 32





