-
Model List:
- 1850 High Reach Loader
- 1. Contents
- 1.0.1. Recognize Safety Information
- 1.0.2. Prevent Machine Runaway
- 1.0.3. Dispose of Waste Properly
- 1.0.4. Avoid Hot Exhaust
- 1.0.5. Handle Fuel SafelyAvoid Fires
- 1.0.6. Prepare for Emergencies
- 1.0.7. Avoid HighPressure Fluids
- 1.0.8. Live With Safety
- 1.0.9. Protect Bystanders
- 1.0.10. Keep Riders off Machine
- 1.0.11. Use Caution on Hillsides
- 1.0.12. Use Caution When Flexing (Extending) Boom
- 1.0.13. Avoid Electrical Power Lines
- 1.0.14. Service Machines Safely
- 1.0.15. Support Machine Properly
- 1.0.16. Remove Paint Before Welding or Heating
- 1.0.17. Use Steps and Handholds Correctly
- 1.0.18. Service Tires Safely
- 1.0.19. Replace Safety Signs
- 1.0.20. Avoid Heating Near Pressurized Fluid Lines
- 1.1. Safety Decals
- 1.1.1. Avoid Electrical Power Lines
- 1.1.2. Safety Instructions
- 1.1.3. Preventing Machine Runaway
- 1.1.4. Stop Machine Before Shifting
- 1.2. Operators Station
- 1.2.1. Loader Name Plate Data
- 1.2.2. Platform
- 1.2.3. Master Disconnect Switch
- 1.3. Operating the Loader
- 1.3.1. Engine BreakIn
- 1.3.2. Prestarting Checks
- 1.3.3. Starting the Engine
- 1.3.4. After Starting and Warm Up
- 1.3.5. Stopping the Engine
- 1.3.6. Loader in Motion
- 1.3.7. Stopping the Loader
- 1.4. Fluid Capacities Recommendations
- 1.4.1. Radiator
- 1.4.2. Transmission
- 1.4.3. Rear Steering Axle
- 1.4.4. Front Rigid Axle
- 1.4.5. Hydraulic Tank
- 1.4.6. Fuel Tank
- 1.4.7. Tire Inflation Pressure
- 1.4.8. Engine Coolant RequirementsFor additional information, refer to
- 1.4.9. Antifreeze
- 1.4.10. Inhibitors (Conditioners)
- 1.4.11. Filling the System
- 1.4.12. Fuel Specifications
- 1.4.13. Sulphur Content
- 1.4.14. Cloud Point
- 1.4.15. Storage and Handling
- 1.4.16. Hydraulic Fluid
- 1.4.17. Engine Oil
- 1.4.18. Transmission
- 1.4.19. Gear Oil Pump Drive
- 1.4.20. Hydroinflation Procedure for Fluid Ballast
- 1.5. Service Points
- 1.5.1. Initial StartUp
- 1.5.2. After First 100 Hours of Operation
- 1.5.3. Every 10 Hours or Daily Operation
- 1.5.4. Every 70 Hours
- 1.5.5. Every 140 Hours 2 Weeks of Operation
- 1.5.6. Every 250 Hours Monthly Operation
- 1.5.7. Every 500 Hours 2 Months of Operation
- 1.5.8. Every 1000 Hours 4 Months of Operation
- 1.5.9. As Necessary
- 1.5.10. Grab Open / Close Cylinders
- 1.5.11. Grab Tie Line Assemblies
- 1.5.12. Grab Shaft
- 1.5.13. Boom Lift Cylinder
- 1.5.14. Boom Swing Cylinders
- 1.5.15. Piler Assembly
- 1.5.16. Mast Swivel Assembly
- 1.5.17. Flex Cylinder
- 1.5.18. Valve Levers
- 1.5.19. Forward / Reverse Pedal
- 1.5.20. Cross and Bearing Assemblies
- 1.5.21. Axle Tie Rod Assembly
- 1.5.22. Steering Knuckles
- 1.5.23. Steering Axle
- 1.5.24. Axle Maintenance Points
- 1.6. Specifications
- 1.6.1. General Specifications
- 1.6.2. Machine Specifications
- 1.6.3. Machine Specifications
- 1.6.4. Machine Specifications
- 1.6.5. Machine Specifications
- 1.6.6. Machine Specifications
- 1.6.7. Unified Inch Bolt and Screw Torque Values
- 1.6.8. Metric Bolt and Screw Torque Values
- 1.6.9. Loading System
- 1.6.10. Control Valve Swing, Flex and Piler
- 1.6.11. Control Valve Grab and Boom Lift
- 1.6.12. Throttle Valve Lift
- 1.6.13. Traction System
- 2. Page Number
- 2.1. Section 05
- 2.2. Section 10
- 2.3. Section 15
- 2.4. Section 45
- 2.5. Section 60
- 2.6. Section 75
- 2.7. Section 90






