-
Model List:
- GreenStar Rate Controller Dry
- 1. Introduction
- 1.1. Foreword
- 1.2. John Deere Technical Information Bookstore
- 1.3. Recognize Safety Information
- 1.4. Understand Signal Words
- 1.5. Follow Safety Instructions
- 1.6. Practice Safe Maintenance
- 1.7. Use Steps and Handholds Correctly
- 1.8. Handle Electronic Components and Brackets Safely
- 1.9. Use Electronic Display Properly
- 1.10. Operate Guidance Systems Safely
- 1.11. Use Seat Belt Properly
- 1.12. Wear Protective Clothing
- 1.13. Operate Safely
- 1.14. Read and Understand MSDS
- 1.15. Handle Agricultural Chemicals Safely
- 1.16. Decommissioning Proper Recycling and Disposal of Fluids and Components
- 2. Safety Signs
- 2.1. Unexpected Conveyor Speed Detected
- 2.2. Unexpected Meter Speed Detected
- 2.3. Unexpected Spinner Speed Detected
- 2.4. Diagnostic Tests or Calibration Procedures
- 3. Regulatory and Compliance Information
- 3.1. Identify Date Code
- 3.2. Customs UnionEAC (English and Russian)
- 3.3. EU Declaration of Conformity
- 3.4. ThailandDeclaration of Conformity
- 3.5. UK Declaration of Conformity
- 4. System Overview
- 4.1. Theory of Operation
- 4.2. GreenStar Rate Controller Requirements
- 5. Component Overview
- 5.1. StarFire Receiver
- 5.2. Display
- 5.3. Switch Box
- 5.4. Foot Switch
- 6. Spreader Overview
- 6.1. Theory of Operation
- 6.2. Spreader Run Page
- 6.3. Component Overview and Compatibility
- 7. Configuring Spreader
- 7.1. Configure GreenStar Rate Controller Dry
- 7.2. Access GreenStar Dry Rate Controller
- 7.3. Implement Setup
- 7.4. System Setup
- 7.5. Alarm Setup
- 7.6. Rate Smoothing Setup
- 8. Configuring Spreader Products
- 8.1. Product Setup
- 8.2. Product Bin Setup
- 8.3. Bin Chaining
- 8.4. Review Product Summary
- 9. Calibrating Spreader
- 9.1. Calibrate CFR Catch Test
- 9.2. Calibrate PWM Limits
- 10. Operating Spreader
- 10.1. GreenStar Rate Controller DrySpreader
- 10.2. Verify UserDefined Values
- 10.3. Bin Level Indicator and Filling
- 10.4. Rate Control
- 10.5. Bin Charging
- 10.6. Bin Chaining
- 10.7. Activate and Deactivate System
- 11. Viewing Spreader Reports and Totals
- 11.1. Reports and Totals
- 12. Spreader Diagnostics
- 12.1. Spreader Diagnostics
- 12.2. Hardware/Software Readings
- 12.3. Switchbox Readings
- 12.4. Delivery System Readings
- 12.5. System Voltages Readings
- 12.6. Working Parameters Readings
- 12.7. Switches/Status Readings
- 12.8. Flow Control Test
- 12.9. Spreader Check Test
- 12.10. Bin Cleanout
- 12.11. Control Valve Test
- 13. Air Cart Overview
- 13.1. Theory of Operation
- 13.2. Air Cart Run Page
- 13.3. Component Overview and Compatibility
- 14. Configuring Air Cart
- 14.1. Configure Air Cart
- 14.2. Access GreenStar Dry Rate Controller
- 14.3. Implement Setup
- 14.4. System Setup
- 14.5. Alarm Setup
- 14.6. Rate Smoothing Setup
- 15. Configuring Air Cart Products
- 15.1. Product Setup
- 15.2. Product Tank Setup
- 15.3. Review Product Summary
- 16. Calibrating Air Cart
- 16.1. Calibrate CFR Catch Test
- 16.2. Calibrate PWM Limits
- 16.3. Calibrate Pressure Sensor
- 16.3.1. Calibrate VoltageBased Pressure Sensor
- 16.3.2. Calibrate OperationBased Pressure Sensor
- 16.4. Calibrate Height Sensor
- 17. Operating Air Cart
- 17.1. GreenStar Rate Controller DryAir Cart
- 17.2. Verify UserDefined Values
- 17.3. Tank Level Indicator and Filling
- 17.4. Rate Control
- 17.5. Tank Charging
- 17.6. Activate and Deactivate System
- 18. Viewing Air Cart Reports and Totals
- 18.1. Reports and Totals
- 19. Air Cart Diagnostics
- 19.1. Air Cart Diagnostics
- 19.2. Hardware/Software Readings
- 19.3. Switchbox Readings
- 19.4. Delivery System Readings
- 19.5. System Voltages Readings
- 19.6. Working Parameters Readings
- 19.7. Switches/Status Readings
- 19.8. Sensors/Status Readings
- 19.8.1. Height Indication
- 19.8.2. Pressure Sensor
- 19.9. Flow Control Test
- 19.10. Air Cart Check Test
- 19.11. Tank Cleanout
- 19.12. Control Valve Test
- 19.13. Clutch Test
- 20. System Speed Signal
- 20.1. System Speed Signal
- 21. Troubleshooting
- 21.1. Rate Controller Dry Troubleshooting
- 21.2. Rate Controller Dry Troubleshooting
- 21.3. Rate Controller Dry Trouble Codes
- 21.4. GreenStar Rate Controller Switch Box Trouble Codes
- 21.5. Control Valve Calibration Number Tuning
- 21.6. Rename Implement
- 21.7. Remove Implement
- 21.8. Observable Symptoms
- 22. Specifications
- 22.1. Pin Connectors
- 22.2. Connector Information for Adapter Harness
- 22.3. Recommended Wire Sizes
- 22.4. Driver Outputs Table
- 23. Maintenance
- 23.1. Preseason Checklist
- 23.2. Daily Checklist
- 23.3. Postseason Checklist
- 24. John Deere Service Literature Available
- 24.1. Technical Information
- 25. John Deere Service Keeps You on The Job
- 25.1. John Deere Is At Your Service






