-
Model List:
- 200 ATJE S1
- ATJ 60 E S1
- 1. Legal disclaimer
- 2. Foreword
- 3. Intervention during warranty period
- 4. Supplier Documentation List
- 5. Sécurité
- 5.1. Servicing Rules
- 6. Opérations Service Machine
- 6.1. Servicing position
- 6.2. Preparation and safety instructions MEWP
- 7. Characteristics and specifications
- 7.1. Technical Datasheet (200 ATJE S1ATJ 60 E S1)
- 7.2. Lubricants and fuel (200 ATJE S1ATJ 60 E S1)
- 8. Information de Référence
- 8.1. Explanation of symbols
- 8.2. List of Abreviations
- 8.3. Standard tightening torques
- 8.4. Metric Imperial unit conversion
- 9. Location
- 9.1. Engine Components
- 10. Removal
- 10.1. Securing the boom
- 10.2. Removing the pump motor cover
- 10.3. Removing the pump motor
- 10.4. Removing the chassis cover
- 10.5. Removing the translation motor
- 11. Refit
- 11.1. Refitting the pump motor
- 11.2. Refitting the translation motor
- 12. Section Not Applicable
- 13. Location
- 13.1. Location of components in the axles
- 14. Control and adjustment
- 14.1. Axle tightening torques
- 14.2. Freewheel Operation
- 15. Removal
- 15.1. Removing the front axle
- 15.2. Removing the rear axle
- 16. Refit
- 16.1. Refitting the front and rear axles
- 17. Section Not Applicable
- 18. Removal
- 18.1. Removing the telescope cylinder slide pads
- 18.2. Removing the arm 3 pads
- 18.3. Removing the moving tube pads
- 19. Refit
- 19.1. Refitting the moving tube pads
- 20. Flow diagrams and schematic diagrams
- 20.1. Hydraulic schematic diagrams
- 21. Location
- 21.1. Location of hydraulic components in the arms
- 21.2. Location of hydraulic components in the chassis
- 21.3. Location of hydraulic components in the turret
- 22. Control and adjustment
- 22.1. Prerequisites for taring proportional distributor
- 22.2. Proportional distributeur calibration (PVG324T)
- 22.3. Distributor block calibration turret
- 22.4. Distributor block calibration chassis
- 22.5. Compensating / Titlting circuit
- 23. Removal
- 23.1. Removing hydraulic pump
- 23.2. Removing the proportional valve elements
- 23.3. Removing the Distributor block (turret)
- 23.4. Removing Distributor block (chassis)
- 23.5. Removing the jib cylinder
- 23.6. Removing the tilting cylinder
- 23.7. Removing the compensating cylinder
- 23.8. Removing the arm 1/2 cylinder
- 23.9. Removing the arm 3 cylinder
- 23.10. Removing the basket rotation cylinder
- 23.11. Removing a cylinder valve block
- 23.12. Removing a valve from a cylinder valve block
- 24. Refit
- 24.1. Refitting hydraulic pump
- 24.2. Refitting cylinders
- 25. Specific tooling
- 25.1. Basic manometer kit
- 25.2. Digital manometer kit
- 26. Characteristics and specifications
- 26.1. Fuses and Relays
- 27. Flow diagrams and schematic diagrams
- 27.1. Electrical Diagram Codification
- 27.2. Electrical marking of cables
- 27.3. Electrical Schematics (200 ATJE S1ATJ 60 E S1)
- 28. Location
- 28.1. Location of electrical control components
- 28.2. Location of electrical power components
- 28.3. Harness location
- 28.4. Base control panel indicators lamps wiring
- 28.5. Basket control panel indicators lamps wiring
- 29. Removal
- 29.1. Removing the UC234 card from the base console
- 29.2. Removing the UD22 card from the panel control base
- 30. Troubleshooting
- 30.1. Error Codes
- 31. Specific tooling
- 31.1. Breakout boxes
- 32. Section Not Applicable
- 33. Control and adjustment
- 33.1. Checking Turntable rotation bearing
- 34. Removal
- 34.1. Removing the Counterweight
- 35. Refit
- 35.1. Installing the Counterweight








